ARCbuildSteel-framed backyard homesCalifornia

Rethinking the backyard home.

Precise steel-framed homes, made off site and assembled on your lot. Fewer material delays, less work on site, and numbers you can check before you build.

The ARC 749, a white flat-roofed backyard home with a black steel pergola, standing in a garden under tall trees
Shown here ARC 749 2 bedrooms · 1 bathroom · 749 sq ft
Indicative priceAbout this price *$224,700
Watch it go up
8 weeks
at best, on your lot once the permit is issuedSource 9
$300
per sq ft, an indicative priceAbout this price *
3 sizes
480, 600 and 749 sq ft
Steel
frames and wall panels, made off site
The finished ARC 749 seen from the front
How it goes up

Foundation to keys
in about eight weeks.

  1. While the permit runsThe kit is made

    The steel frames and wall panels for your home are made off site while the city reviews your plans.

  2. Weeks 1 to 2Foundation

    Your licensed contractor prepares the site and pours the foundation.

  3. Week 3Assembly

    Your contractor puts up the frame, closes it in with the wall panels and puts the roof on. This takes days.

  4. Weeks 4 to 8Finishing

    Your contractor fits the windows, doors, kitchen, bathroom, floors and terrace. Then the keys are yours.

The homes

Three sizes. One steel kit.

Each home comes as a kit of steel frames and wall panels, which a licensed contractor assembles on a foundation on your lot. Pick the size that fits.

Compare the three

Indicative price at $300 per sq ft, to be confirmed by ARCbuild. Site work, foundation, permits and fees depend on your lot.

Run the numbers

What could it rent for?

Type a California ZIP code. We look up the rent the federal housing department publishes for homes of that size there.

Rent a month – HUD Small Area Fair Market Rent
Rent a year–
Indicative priceAbout this price *–
Years of rent to match the price–
California law

The state made room.

California has spent ten years clearing the way for backyard homes. Four rules matter most for an owner.

2

detached ADUs on a house lot

State law guarantees one new detached ADU on a house lot today, and two from 1 January 2027.Source 1

8

on an apartment lot

A lot with an existing apartment building may add up to eight detached ADUs, never more than the homes already there.Source 2

60

days for the city to decide

A city must approve or deny a complete ADU application within 60 days, or it is deemed approved.Source 3

$0

city impact fees at 750 sq ft or less

Cities may not charge impact fees on an ADU of 750 sq ft or less of interior living space. School fees can still apply from 500 sq ft, and so can permit and utility fees.Source 4

Your city sets the rules on size, height and distance from the lot line, but it must allow at least an 800 sq ft home, 16 ft high, 4 ft from the side and rear lot lines.Source 6 This is a summary, not legal advice. Sources

For ADU builders

More homes. Same crew.

A backyard home built on site ties up a crew for months.Source 10 Ours comes as a kit that your crew can take from foundation to finish in about eight weeks once the permit is issued,Source 9 so your team can hand over more homes a year.

  • You keep your client, your site work and your contract.
  • The kit is made off site while the permit is in review.
  • From 1 January 2027 state law guarantees two on a house lot.Source 1
The ARC 480 with its terrace and steel pergola
In conversation

Hear it from ARCbuild.

Two long-form interviews from 2025 on where ARCbuild came from and how it builds.

AI InterConnect · 2025How ARCbuild is rethinking affordable modular housing with techSalvatore Patalano
Prophets of IT podcast · 2025Building the future of housing with empathy and innovationSal Patalano with Jim Punzenberger

The interviews play from YouTube in privacy-enhanced mode and load only when you press play.

How it works

Our kit. Your contractor.

  1. 01

    Check your lot

    Send us the address. We look at what your city allows and which of the three homes fits.

  2. 02

    Plans and permit

    Your plans go to the city. For a complete ADU application the city has 60 days to decide.Source 3

  3. 03

    The kit

    While the permit is in review, the steel frames and wall panels for your home are made off site.

  4. 04

    On your lot

    A licensed contractor builds it: about two weeks for the foundation, days to assemble the kit and about five weeks to finish.

Questions

Asked often.

What is an ADU?

An accessory dwelling unit: a second, smaller home on the same lot as a house or an apartment building, with its own kitchen, bathroom and entrance. In California it is also called a backyard home, a granny flat or a casita.

How long does it take?

As few as eight weeks on your lot once the permit is issued, by ARCbuild's own figure: about two weeks for the foundation, days to assemble the kit and about five weeks to finish.Source 9 The frames and wall panels are made off site while the city reviews your plans.

The permit comes first and is separate. For a complete application, California gives the city 60 days to approve or deny it.Source 3

What does it cost?

The indicative price is $300 per sq ft: $144,000 for the ARC 480, $180,000 for the ARC 600, $224,700 for the ARC 749, to be confirmed by ARCbuild.About this price * The site work, the foundation, the utility connections, the permit and your city's fees depend on your lot: your contractor prices the work on the lot, and your city sets its fees.

The financing calculator shows what that means a month.

Can I rent it out?

Yes. A detached ADU built under the state's standard guarantee must be rented for more than 30 days at a time; for other ADUs your city sets the rule.Source 5 The rental income calculator shows the rent HUD publishes for your ZIP code.

How many can I put on my lot?

On a lot with a single-family house, state law guarantees one detached ADU today and two from 1 January 2027.Source 1 On a lot with an existing apartment building it allows up to eight detached ADUs, but never more than the number of homes already in the building.Source 2 Your city sets the rules on size, height and distance from the lot line, but state law guarantees at least an 800 sq ft home, 16 ft high, 4 ft from the side and rear lot lines.Source 6

Does a steel frame help against wildfire?

The frame and wall studs are light-gauge steel, which does not burn. Fire safety still depends on the whole home: on a lot in a fire hazard zone, the plans must also meet California's wildfire building rules for the siding, roof, vents and windows.

Who builds it on my lot?

Licensed local contractors, yours or a partner builder's: they do the site work, the foundation, the assembly and the finishing. ARCbuild supplies the home as a kit of steel frames and wall panels.

Where do the numbers in the calculators come from?

From public sources and from what you type in: rents from the U.S. Department of Housing and Urban Development, standard loan formulas, and starting values you can change. Sources and methods lists where each starting value comes from, and says which are our own assumptions. The results are estimates, not a quote, a loan offer or investment advice.

The ARC 600 with its low gable roof

Tell us about your lot.

Send the address and what you have in mind. We come back with which home fits and what happens next.