For ADU builders

More homes. Same crew.

A backyard home built on site ties up a crew for months.Source 10 Ours comes as a kit of steel frames and wall panels: your team puts in the foundation, assembles the kit in days and finishes it,Source 9 so the same crew can hand over more homes a year.

Talk to us about partnering

Your client. Your contract.

  • You keep your client, your site work and your contract. We supply the kit.
  • The frames and wall panels are made off site while the permit is in review, so the kit can be ready when the foundation is.
  • Three standard homes, each with its own drawing set, so every project starts from the same plans.
  • From 1 January 2027 state law guarantees two detached ADUs on a house lot.Source 1 On a lot with an existing apartment building it already allows up to eight, but no more than the homes already there.Source 2
Inside the ARC 749
A project, step by step

Who does what.

  1. 01You

    Win the client and the lot

    You sell the project, check the lot and submit the plans for one of the three homes.

  2. 02ARCbuild

    Supply the kit

    While the city reviews the plans, the steel frames and wall panels are made off site.

  3. 03You

    Foundation and assembly

    Your crew prepares the site and pours the foundation, then assembles the kit in days.

  4. 04You

    Finish and hand over

    Windows, doors, kitchen, bathroom and floors, then the keys to your client.

The ARC 600 with its low gable roof

Build the next one with us.

Tell us where you build and how many homes a year. We come back with how a partnership would work for you.